Transparent Guidance • Tamil Nadu Slabs

PM Surya Ghar & TANGEDCO Subsidy Reality Guide

Understand exact government central financial assistance (CFA) slabs, how TANGEDCO net metering works, required documents, and what steps are needed to secure your Direct Benefit Transfer (DBT).

⚠️Statutory Scheme & Subsidy Notice

Government Schemes & Subsidy Notice: Agasthyaa Bharat Green Power assists eligible consumers with solar system sizing, quality installation, DISCOM technical feasibility documentation, and filing on the official National Portal. We do not represent any government department and cannot guarantee subsidy sanctions, timelines, or approval amounts.

All subsidy disbursements are subject to independent eligibility verification, technical inspection, and direct fund transfer by the Ministry of New and Renewable Energy (MNRE) and TANGEDCO in accordance with prevailing government guidelines.

PM Surya Ghar: Muft Bijli Yojana Central Subsidy Slabs

Applicable for individual residential houses in Tamil Nadu with grid-connected rooftop systems.

Starter Capacity

1 kW System

Ideal for homes with bimonthly bills under ₹1,500 using basic appliances, fan, lighting, and TV.

Eligible Direct Subsidy₹30,000CFA credited to your bank via DBT
Roof Space Needed: ~100 sq.ft | Daily Output: 4–5 units
Most Popular
Medium Household

2 kW System

Ideal for homes with 1 inverter AC, refrigerator, washing machine, and ₹2,500–₹4,000 bimonthly bill.

Eligible Direct Subsidy₹60,000CFA credited to your bank via DBT
Roof Space Needed: ~200 sq.ft | Daily Output: 8–10 units
Maximum Subsidy Cap

3 kW to 10 kW

Ideal for independent villas with 2+ ACs, geysers, or EV charging with ₹5,000+ bimonthly bill.

Maximum Capped Subsidy₹78,000Maximum cap set by MNRE guidelines
Roof Space Needed: 300+ sq.ft | Daily Output: 12–40+ units

The 6-Step Subsidy & Net Metering Workflow

How the application moves from online registration to money in your bank account.

1

Portal Registration

Register on pmsuryaghar.gov.in selecting Tamil Nadu and TANGEDCO as your electricity distribution company (Discom) with your Consumer Number.

2

Technical Feasibility (TFA)

TANGEDCO inspects the local distribution transformer (DT) loading. Once capacity is approved, the portal issues Technical Feasibility Approval.

3

DCR Solar Installation

Agasthyaa Bharat Green Power installs MNRE-mandated Domestic Content Requirement (DCR) panels, certified on-grid inverter, and ACDB/DCDB protection.

4

Work Completion Report

We submit module serial numbers, test certificates, inverter specifications, and geo-tagged photographs to the National Portal.

5

TANGEDCO Net Meter

TANGEDCO section officers inspect the installation, program and seal the bi-directional net meter, and issue the Joint Commissioning Certificate (JCC).

6

DBT Subsidy Transfer

Within 30–45 days of JCC upload, the Central Government directly transfers the subsidy (up to ₹78,000) directly into your linked bank account.

Required Document Checklist

  • Latest TANGEDCO Electricity Bill: Must show active service number with applicant’s name or family link.
  • Aadhaar Card: Must be linked with an active mobile number for OTP verification on National Portal.
  • Cancelled Cheque / Bank Passbook: Name must strictly match the electricity bill name for DBT deposit.
  • Property Tax Receipt / Patta / Ownership Proof: Confirms authorization to install panels on the terrace.
  • Passport Size Photo: Digital upload for beneficiary profile.

TANGEDCO Net Metering Key Facts

Bi-Directional MeterRecords both units consumed from TANGEDCO and excess solar units sent back to the grid. Your bill is generated based on Net Units.
Sanctioned Load RuleIn Tamil Nadu, the maximum solar capacity you can install cannot exceed 100% of your sanctioned connected load (e.g., 5 kW sanctioned load allows up to 5 kW solar). If needed, we assist in load enhancement requests.
DCR Mandatory for SubsidySubsidy is ONLY given if solar cells and modules are manufactured in India (DCR compliance). Imported or non-DCR modules are not eligible for government subsidy.

Official Government Portals

Verify guidelines or register directly on the official Ministry of New and Renewable Energy (MNRE) portal.

Need Help with Your Subsidy Application?

Leave your details or TANGEDCO consumer number. Our subsidy liaison desk will verify your transformer capacity and handle portal documentation.

🔒 Your phone number is strictly used for site survey coordination. Zero spam.

📞Call Expert💬WhatsAppSurvey →